New Automotive Workshop Facility

Location

Basingstoke, Hampshire

Lead Time

5 weeks

Products

  • Mezzanine Floor
  • Heavy Duty Storage
  • Parts Department Shelving
  • Plastic Containers
  • Mesh partitioning around mezzanine floor

Time on site

3 days

Additional Details

A mezzanine floor was the starting point for this new storage facility and workshop area.

Our client is a recycling company that services and maintain their own fleet of skip lorries and other vehicles.

They needed a compact and versatile storage solution that made the best use of the space they had available.

A mezzanine floor formed the basis of the project, allowing room for shelving both above and below. We provided a few bays of heavy duty longspan shelving and some plastic containers for small part storage.

Finally, we installed some pallet racking to store palletised heavy items and we also used steel checker plate to convert one of the lower levels into a workbench area.